IMEC was engaged to support with design and onsite construction management for a new primary pump station at Silverlake Resources Deflector Gold Mine.
Works included:
- Hydraulic modelling underground dewatering network
- Hydraulic equipment specification incl:
- Pumps
- Pipes
- Valving
- Sump sizing
- Engineering and detailed design incl:
- Concrete plinths & Slab
- Suction/discharge piping & rising main to surface
- Monorail Cranes
- Onsite construction management